sched: Avoid prev->stime underflow

Dave Hansen reported strange utime/stime values on his system:
https://lkml.org/lkml/2013/4/4/435

This happens because prev->stime value is bigger than rtime
value. Root of the problem are non-monotonic rtime values (i.e.
current rtime is smaller than previous rtime) and that should be
debugged and fixed.

But since problem did not manifest itself before commit
62188451f0d63add7ad0cd2a1ae269d600c1663d "cputime: Avoid
multiplication overflow on utime scaling", it should be threated
as regression, which we can easily fixed on cputime_adjust()
function.

For now, let's apply this fix, but further work is needed to fix
root of the problem.

Reported-and-tested-by: Dave Hansen <dave@sr71.net>
Cc: <stable@vger.kernel.org> # 3.9+
Signed-off-by: Stanislaw Gruszka <sgruszka@redhat.com>
Cc: Frederic Weisbecker <fweisbec@gmail.com>
Cc: rostedt@goodmis.org
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Dave Hansen <dave@sr71.net>
Cc: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1367314507-9728-3-git-send-email-sgruszka@redhat.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
1 file changed