[PATCH] yenta: do power-up only after socket is configured

Power-up the card only after the socket is configured. power-down in
the old place. The point is not to power-up the card before the interrupt
routing is set up correctly.

Signed-off-by: Daniel Ritz <daniel.ritz@gmx.ch>
Signed-off-by: Dominik Brodowski <linux@dominikbrodowski.net>
1 file changed