commit | 87da1b937dc478a1562c1e0ed6c80256e7ee2c53 | [log] [tgz] |
---|---|---|
author | yangg <yangg@google.com> | Thu Dec 11 15:57:37 2014 -0800 |
committer | Nicolas Noble <nnoble@google.com> | Fri Dec 12 16:08:10 2014 -0800 |
tree | 5d76f8841133d4ae5c9a10e95b9bcd6569ed443e | |
parent | 33a2168453a65e032f9582b3166e369d3f826c67 [diff] |
Make the default deadline gpr_inf_future to avoid mismatch between gpr_inf_future and time_point::max(). The redundant AbsoluteDeadline prefix is removed from the utility function names. Now the ClientContext holds a gpr_timespec instead of a time_point. A test will be added in the server side deadline support cl. Change on 2014/12/11 by yangg <yangg@google.com> ------------- Created by MOE: http://code.google.com/p/moe-java MOE_MIGRATED_REVID=81920769