Add way to run a set of 11n tests based on the title of the long suite

The complete 11n suite is considerably long and can take greater than
12 hours to run.  In order to dbug problems, there is now a test
called, test_11n_capabilities_debug, that when a key, debug_11n_tests,
is placed in the config, can take a list of titles from the results of
the long running suite and run that test individually.

Bug: None
Test: Verified with multiple titles from the long test suite, and
      other valid and invalid inputs.  Also this test does not
      run as part of the comnplete suite as this is only for
      debugging.

Change-Id: I7fd3a2552294b0934efda51689b945288e8777dc
1 file changed
tree: a3e7f09b34489ccb37719dff517d83fc11c2768f
  1. acts/
  2. tools/
  3. wts-acts/
  4. Android.mk
  5. OWNERS
  6. PREUPLOAD.cfg