qcacld-3.0: Close cds sched as part of cds_close()
cds_sched_open is called as part of cds_open, but cds_sched_close is
called outside of cds_close. This leads to situations where the CDS
scheduler is started but not properly closed. Move the call to
cds_sched_close into cds_close, such that the CDS scheduler lifecycle is
tied directly to the CDS core lifecycle, to prevent CDS from closing
without closing the CDS scheduler.
Change-Id: I440ec279e6b750a7b41ec05000fc66b6cebdb8d8
CRs-Fixed: 2151049
2 files changed